Cory Fotherfill reported Mark Gray has
reconnected the wiring to the fuel pump relay, engine run, signal relay
as well as connected the main generator back in. Most of the relays and
some wiring was robbed at some point in 4268's life after the Boston &
Maine. Also most anything that was copper was stolen as well, which is making
the reconstruction of the locomotive time consuming. Most of what has been
missing we are able to salvage or modify from the 1757.