Wayne Allen worked on connecting the shutter air lines this weekend and connected the last water line to the air compressor as well as installed a vent pipe for water tank. Cory Fothergill connected the #2 cooling fan which has had a damaged plug. Removed the axle alternator from the rear truck to move to the front truck for the speedometer. Cory also picked up piping supplies and help lay out the air brake equipment for next weeks install. Ryan Fothergill worked on mounting the containment tanks between the battery box and the fuel tank.