Monday, January 2, 2023

Getting the F Units Ready for the Mass Bay Trip on January 7th

 

Wayne Allen, Eric Grover, Cory Fothergill and Mark Gray brought the F units back to life from their winter hibernation this weekend. Some electrical work was performed to correct the transition in 4266. Several water leaks corrected, and grab irons were installed to the rear of the locomotives to enable easier access to the roof for inspections. The locomotives will be powering the east end of the Mass Bay Trip next Saturday the 7th.