On Friday, Wayne Allen , Adam Bartley and Cory Fothergill
performed the 736 day airbrake changeout on the 72. They reconnected all 4
traction motors, added journal oil and topped off crater and support bearing
oil. All brake rigging was reinstalled and side bearing clamps as well. The
locomotive is closer to being ready to test.