Monday, September 30, 2024

Getting 1741 Ready for our Fall Trip reported by Cory Fothergill on September 29, 2024

 

Over the last several days more work was completed on 1741 to get her ready for our fall trip. Some cosmetic details were added such as new builders plates , painted door gaskets , mirrors and newer glass. In the sheet metal department Ryan has finished cleaning out the basement , removing all the rotted metal that once supported the traction motor blowers duct-work and assembly. The downstairs of the GP7/9s all suffer from years of rust and rot from New England’s harsh weather. Ryan Fothergill has removed all of the rotted metal right down to the frame and began building everything back up. In another week the subfloor should be rebuilt, and lastly the bathroom floor will be replaced for the toilet. Also in other news, wiring was reconnected to factory standards to the front platform light, and years of excess wiring left in dead conduit were all removed from under the cab to clean up the locomotive.